Sn. name of project Location Value of Contract/year completed CLIENT Description of work carried out
  ROAD PROJECTS        
1. Arun Access Road (192 km) Koshi 400,000.00 / Oct 1987 DoR / SWK F
2. Arun Access Road (192 km) Koshi 2,100,000.00 / Dec 1989 DoR / SWK D
3. Chougadha-Thingan Road (20 km) Hetauda   266,000.00 / June 1988 DoR / Hetauda D
4. Mangalsen-Karnali Road (8 km) Achham 160,000.00 / June 1989 DoR / Design Branch D
5. Waling – Paiyun Hatia Road (6 km) Syangja 120,000.00 / June 1989 DoR / Design Branch D
6. Trishuli-Deorali Road (14 km) Nuwakot 65,600.00 / Dec 1990 DoR / Nuwakot F
7. Trishuli-Deorali Road (10 km) Nuwakot 201,100.00 / June 1991 DoR / Nuwakot D
8. Road Network Study 42 western districts 4,798,360.00 / July 1993   DoR / APROSC F
9. Bhedetar-Dandabazar (50 km) Dhankuta 577,693,49 / Oct 1994 DoR / Dhankuta D
10. Access Road to Sharda – Babai Multipurpose Project (10 Km) Pyuthan   90,000.00 / July 1996 EDC D
11. Access Road to Sharada-Babai Multipurpose Project (15.6 Km.) Puyuthan  185,524.00 / May 1997 EDC F
12. 251 km Agricultural Roads in three districts:

·         Khopasi-Taldhunga (60 Km)

·         Chihandanda-Baidi (29 Km)

·         Dhakardi-Bhirkot (23 Km)

·         Belbhanjyang-Deorali (13 Km)

·         Baglung-Burtibang (105 Km)

·         Baglung-Kushmisera (21 Km)

 

Kavre

Tanahun

Tanahun

Tanahun

Baglung

Baglung

82,129,488.00 / Feb 2003 MLD/ADB

Rural Infrastructure Development Project

D,T,S
13. Kande – Panchase, (20.6 km) Kaski / Parbat 342,607.40 / July 1997 DoR / Design Branch D
14. Jatahi – Matihani, (10.2 km) Dhanusha 169,174.08 / July 1997 DoR / Design  Branch D
15. Kalayanpur-Chikana  Bastipur, (16.4 km) Siraha 272,256.60 / July 1997 DoR / Design Branch D
16. Kusma – Neta, (10 km) Parbat 35,940.00 / July 1998 DoR / Planning Branch F
17. Rampur – Arun River, (15 km) Palpa 53,910.00 / July 1998 DoR / Planning Branch F
18. Sanuwa – Simghat – Purkherdhara, (15 km) Gulmi 53,910.00 / July 1998 DoR / Planning Branch F
19. Bayarghari – Biruwa, (14 km) Syangja 50,316.00 / July 1998 DoR / Planning Branch F
20. Kyanin Road, (8 Km) Tanahu 28,752.00 / July 1998 DoR / Planning Branch F
21. Buddha Singh Road, (8 km) Tanahu 28,752.00 / July 1998 DoR / Planning Branch F
22. Karanephat – Kalika, (7 km) Kaski 25,158.00 / July 1998 DoR / Planning Branch F
23. Talbesi – Lipyani, (7 km) Kaski 25,158.00 / July 1998 DoR / Planning Branch F
24. Majhathan – Begnas, (14 km) Kaski 50,316.00 / July 1998 DoR / Planning Branch F
25. Ranibas – Ghoretar –  Rankebazar, (33 km) Bhojpur 91,740.00 / July 1998 DoR / Planning Branch F
26. Tumlingtar – Num, (28 km) Sankhuwasabha 77,840.00 / July 1998 DoR / Planning Branch F
27. Mangalbare – Rambeni, (28 km) Sankhuwasabha 77,840.00 / July 1998 DoR / Planning Branch F
28. Resealing Training Contract, Itahari – Jogbani Road (30 Km) Sunsari / Morang 7,454,838.00 / Nov. 1999 DoR / Road Maintenance Project D, T, S
29. Dakha – Kordi – Sotre (19 km) Pyuthan 155,375.00 / July 1999 DoR / Planning Branch F
30. Charneta – Khaira – Khalanga Road (15 km) Pyuthan 93,225.00 / July 1999 DoR / Planning Branch F
31. Damti – Shyaulibang (25.50 km) Pyuthan 310,750.00 / July 1999 DoR / Planning Branch F
32. Badara-Machhi-Gaumukhi (26km) Pyuthan 161,590.00 / July 1999 DoR / Planning Branch F
33. Rangeliya-Nikaratar Road (25 km) Kalikot 57,375.00 / July 1999 DoR / Planning Branch F
34. Bardiya Highway Jayanagar Road, (23 km) Bardiya 57,375.00 / July 1999 DoR / Planning Branch F
35. Khochelekh-Sittad-Rupeshwor  (25 km) Baitadi 57,375.00 / July 1999 DoR / Planning Branch F
36. Katase – Jagatpur Katase Road (23.95 km) Kailali 57,375.00 / July 1999 DoR / Planning Branch F
37. Kechana – Kabal -Bharat Simana (3.5 km) Jhapa 23,698.00 / June 1999 DoR / Planning Branch F
38. Murkhuchee – Bhuttar (22 Km) Udaypur 148,962.00 / June 1999 DoR / Planning Branch F
39. Agriculture Roads

·         Satpatiya-Danfe (8.452 Km)

·         Kumba Bazar – Bhansar (4.586 Km)

·         Manan – Rajapur (10.894 Km)

 

Bardiya

 

 

 

63,390.00 / June 1999

34,395.00 / June 1999

81,982.50 / June 1999

DDC / MLD / Bardiya D
40. Agriculture Roads

·         Deokhuri Telia – Rihar (3 Km)

·         Lalmatiya – Satbhariya (38.7 Km)

 

Dang

 

 

23,670.00 / June 1999

305,816.40 / June 1999

DDC / MLD / Dang D
41. Agriculture Roads

·         Chitaha – Tanmuna (1.7 Km)

·         Rajgunj, Sinubari – Dewangunj, Biratnagar – Sahebgunj (8.72 Km)

·         Chitaha – Chimdi (4.8 Km)

Inarwa

 

 

16,225.00 / April 2000

48,675.00 / April 2000

 

27,258.00 / April 2000

DDC / Inarwa D
42. Jajarkot – Dolpa (135 Km) Dolpa 246,220.00 / July 2000 DoR / Planning Branch F
43. Indregauda – Ratandanda- Tamghas (25Km) Gulmi 42,672.00 / June 2000 DoR / Planning Branch F
44. Lamachour – Majuwa (20 Km) Kaski 23,114.00 / June 2000 DoR / Planning Branch F
45. Luham – Kabhra – Rampur (32.65 Km) Salyan 224,958.50 / March 2001 DDC / Salyan D
46. Simikot – Maila Green Road (30 Km) Humla 280,500.00 / Aug 2003 WUPAP, Nepalgunj F, D, IEE
47. Tumlingtar – Chyankuti (19.05 km) Sakhuwasabha 472,689.00 / July 2005 RPN / GTZ D, S
48. Dipayal – Daud- Patihalne Rural Road (22 km) Doti 1,789,690.00 / Nov 2005 DDC / Doti D, S
49. Dethala – Khalanga Rural Road (44.7 km) Darchula 5,875,001.00 / Jun 2008  RPN / GTZ/ INFRIN D, S
50. Diktel – Khotang Bazar (74.5 Km) Khotang 545,820.00 / May 2006 DDC / RAP / Khotang D,  IEE
51. Lamidanda – Aishelukharka (43.5 Km) Khotang 273,212.00 / May 2006 DDC / RAP / Khotang D, IEE
52. Gairitand – Binayak  – Belkhet  (26 km) Achham 7,840,091.00 Apr 2008 RPN / GTZ D, S
53. Gwarkho – Lubhu – Lamatar, Study of Improvement & Development of Radial Road joining Inner and Outer Ring Road Lalitpur 97,094.00/April 2007 DUDBC, Outer Ring Road Development Project, Anamnagar D,S
54. Marke – Rampur Rural Road (24.5 Km) Salyan 4,575,556.00/ Jun 2008 RPN / GTZ S
55. Dhorchour – Gurudase (20 km) Dry Season Rural Road Salyan 6,295,460.85 / Nov 2010 RAIDP / DoLIDAR D, IEE, S
56. Beteni – Choukibhanjyang – Majhkharka                 (31.28 km) Dry Season Rural Road Udaipur 6,251,490.27 / Nov 2010 RAIDP / DoLIDAR D, IEE, S
57. Dunai – Supani Road (14.39 km and  Dunai Lasicap-Dho Road  (15 km) Dolpa 32,219,400.78 / Oct 2011 DRILP /DoLIDAR D, IEE, S
58. Gamgadhi – Talcha – Rara Road (14.50 km)  and Kalakandalek-Khamale-Kawa Road (16.5 km) Mugu 31,523,933.30 / Nov 2011 DRILP /DoLIDAR D, IEE, S
59. a. Bitule – Latinath – Paribagar (14.775 km)

b. Khar – Khalanga (18.620 km)

Darchula 11,114,338 / Nov 2011

16,671,508 / Nov 2011

 

 

DRILP /DoLIDAR D, IEE, S
60. Tribhuvanbasti – Laxmipur – Belauri Road (8.2 km) Kanchanpur 144,640.00 / July 2009 DDC / Kanchanpur D
61. Feasibility Study of Ramnagar Gaidakot Bypass Road (9.20 km) Nawalparasi 440,700/ July 2009 Ministry of Physical Planning & Work F
62. Detail Engineering Survey and Design of 47 km of following sectors of Puspalal (Midhill) Highway.

a)      Khurkot – Hiberbesi (0 – km 11)

b)      Pokhari – Ghurmi (25 – km 37)

c)       Pokhari – Ghurmi (37 – km 49)

d)      Pokhari – Ghurmi (49 – km 61)

Sindhuli

Sindhuli

Sindhuli

Sindhuli

1,134,978.00 / Mar 2009 Puspalal Lokmarga/ DoR D

D

D

D

63. Luham – Kavre – Rampur – Dimure – Baluwa – Hattidamar – Kaprechaur Dry Season Road – (35 km) Salyan 3,760,467.17 / July 2010 RAIDP / DoLIDAR D, IEE, S
64. Majhkkharka – Puware – Rauthapokhari Dry Season Road.- (35 km) Udayapur 3,051,475.22 / July 2010 RAIDP / DoLIDAR D, IEE, S
65. Detail Engineering Survey and Design of  Nijgadh-Patura-Bankul-Gaur Road (37 km) Rautahat 501720/July 2013 DOR D
66. Feasibility Study of Budar Nile Bunk Road (46.3 km) Kanchanpur 340695/July 2014 DOR F
67. Detail Engineering Survey, Design and Report Preparation of :

—   Beni Barbang Road (26 km)

—   Gartigaun Dhanbot Jinbang Road (30 km)

—   Ghasa Jomsom Korolla Road (37 km)

 

 

Myagdi

Rolpa

Mustang

2567360/ Mar 2016 DoR D
68. Detail Engineering Survey, Design and Report Preparation of :

—   Dumkibas Palpa  Road (64 km)

—   Barthahawa Samanpur Katahariya Road (35 km)

 

 

 

Nawalparasi

Bara

2110840/ Feb 2016 DoR D