Sn. | name of project | Location | Value of Contract/year completed | CLIENT | Description of work carried out |
BRIDGE PROJECTS
|
|||||
1. | 4-Valley Bridges
· Shova Bhagwati (70 m) · Nakhu Khola (35 m) · Naikap (35 m) · Ratopool (35 m) |
Kathmandu | 4,200,821.00 / June 1993 | DoR / WB | D, S |
2. | 3-Bridges between and Malekhu
· Agra Khola (105 m) · Belkhu Khola (85 m) · Malekhu Khola (90 m) |
Naubise | 300,000.00 / March 1994 | DoR / WB | D |
3. | · Solti River, (85.6 m)
· Hadiya -I, (66.0 m) · Hadiya -II, (11.0 m) |
Morang
Jhapa Jhapa |
355,580.00 / Sep 1997 | DoR / Bridge Unit | D,R |
4. | · Sisne Khola, (40 m)
· Bangi Khola (45m) |
Arghakhanchi | 49,950.00 / July 2000 | DoR / Planning Branch | F |
5. | 2 bridges between Kharbang – Galkot Road
· Saune Khola (22 m) · Daram Khola (22 m) 1 Bridge between Baglung – Kusmisera Road · Kathe Khola (32 m) 2 Bridges between Khopasi – Taldhunga Road · Ladku Khola (22 m) · Bagmati River (45 m) |
Baglung
Baglung
Kavre
|
1,638,074.00 / May 2001 | MLD / ADB
Rural Infrastructure Development Project |
D |
6. | · Chepe – Dovankot (50 m)
· Khudi Khola Bridge (17.5 m) · Sirsiya Bridge (60 m) · Daringal Bridge (35 m) |
Gorkha
Kaski Parsa Dhading |
124,930.00 / July 2001 | DoR / Planning Branch | F |
7. | Bhuteni River along Haldibari – Bhadrapur Road | Jhapa | 54,500.00 / Sep 2004 | DoR / Planning Branch | F |
8. | Ninda Khola Bridge along Sanam Chowk – Telpani Road | Jhapa | 54,500.00 / Sep 2004 | DoR / Planning Branch | F |
9. | Kurkure Pani Bridge (35 m) | Darchula | 537,919.00 / Jul. 2007 | GTZ | D,S |
10. | Pilot Community Steel Truss Bridges
· Khudi khola (25 m) · Ghogawa Khola (18 m) |
Kaski Kapilvastu | 581,950.00 / July 2008 | MLD / Dept of local infrastructure development and agricultural roads (DoLIDAR) | S |
11. | Detail Study of Community Rural Road Bridge at Danh Khola, Morang (24 m) | Morang | 470,000.00/ July 2008 | Community Rural Road Bridge / DoLIDAR | D |
12. | Detail Feasibility Study, Design & Soil Investigation of Stula Khola Road Bridge (25m) | Gorkha | 491098.00/ July 2009 | Community Rural Road Bridge / DoLIDAR | D |
13. | Detail Engineering Survey, Soil Investigation, Hydrological Analysis and Design of Mainawati Khola Bridge (60 m) | Siraha | 499,460.00/July 2010 | Community Rural Road Bridge / DoLIDAR | D |
14. | Feasibility Study, Detail Engineering Survey, Soil Investigation, Hydrological Analysis and Detailed Design of following Bridges:
· Katuwa Khola Bridge (61.68 m) · Sisne Khola Bridge (60 m) · Rapti (Chape Khola) Bridge (45.60 m) · Jhimruk Khola Bridge(41.60 m) · Bhiigri Khola Bridge(20.8 m) · Chiuragad Khola Bridge(22.8m) · Sulichaur Gajuri Bridge(60 m) · Uwa Khola Bridge(45.6 m) |
Dang Dang Pyuthan Pyuthan Pyuthan Rolpa Rolpa Rolpa |
5,505,360.00 / Jul 2010 | DOR/ Bridge Unit | F, D |
15. | Feasibility Study, Detail Engineering Survey, Soil Investigation, Hydrological Study and Detail Design of Andhikohla Bridge, Bayartari | Syangja | 510,195/July 2012 | DoR/Bridge Projects | FD |
16. | Detail Engineering Survey, Soil Investigation, Hydrological analysis and detailed design work of following Rural Road Bridge
— Pakhar Khola Bridge |
Sindhupalchowk | 546,976.50/July 2012 | Trail Bridge Section/ DoLIDAR | D |
17. | Feasibility Study, Detail Engineering Survey, Soil Investigation, Hydrological Study and Detail Design of following Bridges in Dhading
— Mahesh Khola Bridge (41.20m) Naubise — Ankhu Khola Bridge (60.8m) Khahare Bazar — Mahesh Khola Bridge (25.80m) Dharke — Tuni Khola Bridge (37.6m) Malekhu — Manpang Khola Bridge (37.6m) Siurenibensi — Ankhu Khola Bridge (60.80m) Bangeraha — Trisuli Khola Bridge (129.05) Forsetar — Molung Khola Bridge (37.6m) Koshbhanjyang
|
Dhading | 2,544,000/June 2012 | DoR/Bridge Unit | F,D |
18. | Feasibility Study, Detail Engineering Survey, Soil Investigation, Hydrological Study and Detail Design of following Bridges in Syangja
— Dhau Khola Bridge (15.60m ) Waling — Maidi Khola Bridge (41.60m) Syangja — Andhi Khola Bridge ( 62.40m) Galyang — Kaligandi River Bridge (181.6m) Rampur — Kaligandi River Bridge (163.6m) Hungighat — Kaligandi River Bridge (152.4m) Syangja
|
Syangya | 2,040,000/June 2012 | DoR/Bridge Unit | F,D |
19. | Site Selection, detail Engineering survey, Geo-technical/Hydrological Investigation and detailed design of appropriate River Crossings of :
— Kamdehi Bridge — Lohiniya Bridge — Thuli Bheri Bridge |
Rautahat
Rautahat Rukum |
692415/May 2014 | Local Roads Bridge Program (LRBP) | F,D |
20. | Feasibility Study, Detailed Engineering Survey, Hydrological Study, Social Investigation and Detailed Design of Bridges:
1. Yanta Khola Bridge (25 m) 2. Sera Khola Bridge (25 m) 3. Daunte River Bridge (15 m) 4. Kali Khola Bridge (40 m) 5. Pahare Khola Bridge (30 m) 6. Baidhanath Khola Bridge (40 m) 7. Gideri Khola Bridge (60 m) 8. Basawa Khola Bridge (25 m) 9. Baijanath Khola Bridge (80 m) 10. Bangari Bridge (70m) 11. Sirsiya River Bridge (70 m) |
1. Bhojpur 2. Okhaldhunga 3. Khotang 4. Khotang 5. Khotang 6. Udayapur 7. Udaypur 8. Udayapur 9. Bara 10. Bara 11. Bara |
90,02,710.00
July7, 2013 to July 15, 2016
|
Department of Roads
Bridge Branch |
F,D |