Sn. name of project Location Value of Contract/year completed CLIENT Description of work carried out
   

BRIDGE PROJECTS

 

       
1. 4-Valley Bridges

·                  Shova Bhagwati (70 m)

·         Nakhu Khola (35 m)

·         Naikap (35 m)

·          Ratopool (35 m)

Kathmandu 4,200,821.00 / June 1993 DoR / WB D, S
2. 3-Bridges between and Malekhu

·         Agra Khola (105 m)

·         Belkhu Khola (85 m)

·         Malekhu Khola (90 m)

Naubise   300,000.00 / March 1994 DoR / WB D
3. ·         Solti River, (85.6 m)

·         Hadiya -I, (66.0 m)

·         Hadiya -II, (11.0 m)

Morang

Jhapa

Jhapa

 355,580.00 / Sep 1997 DoR / Bridge Unit D,R
4. ·         Sisne Khola, (40 m)

·         Bangi Khola (45m)

Arghakhanchi 49,950.00 / July 2000 DoR / Planning Branch F
5. 2 bridges between Kharbang – Galkot Road

·         Saune Khola (22 m)

·         Daram Khola (22 m)

1 Bridge between Baglung – Kusmisera Road

·         Kathe Khola (32 m)

2 Bridges between Khopasi – Taldhunga Road

·         Ladku Khola (22 m)

·         Bagmati River (45 m)

Baglung

 

 

Baglung

 

 

Kavre

 

 

1,638,074.00 / May 2001 MLD / ADB

Rural Infrastructure Development Project

D
6. ·         Chepe – Dovankot (50 m)

·         Khudi Khola Bridge (17.5 m)

·         Sirsiya Bridge (60 m)

·         Daringal Bridge (35 m)

Gorkha

Kaski

Parsa

Dhading

124,930.00 / July 2001 DoR / Planning Branch F
7. Bhuteni River along Haldibari – Bhadrapur Road Jhapa 54,500.00 / Sep 2004 DoR / Planning Branch F
8. Ninda Khola Bridge along Sanam Chowk – Telpani Road Jhapa 54,500.00 / Sep 2004 DoR / Planning Branch F
9. Kurkure Pani Bridge (35 m) Darchula 537,919.00 / Jul. 2007 GTZ D,S
10. Pilot Community Steel Truss Bridges

·  Khudi khola (25 m)

·  Ghogawa Khola (18 m)

Kaski  Kapilvastu 581,950.00 / July 2008 MLD / Dept of local infrastructure development and agricultural roads (DoLIDAR) S
11. Detail Study of Community Rural Road Bridge at Danh Khola, Morang (24 m) Morang 470,000.00/ July 2008 Community Rural Road Bridge / DoLIDAR D
12. Detail Feasibility Study, Design & Soil Investigation of Stula Khola Road Bridge (25m) Gorkha 491098.00/ July 2009 Community Rural Road Bridge / DoLIDAR D
13. Detail Engineering Survey, Soil Investigation, Hydrological Analysis and Design of Mainawati Khola Bridge (60 m) Siraha 499,460.00/July 2010 Community Rural Road Bridge / DoLIDAR D
14. Feasibility Study, Detail Engineering Survey, Soil Investigation, Hydrological Analysis and Detailed Design of following Bridges:

·         Katuwa Khola Bridge (61.68 m)

·         Sisne Khola Bridge (60 m)

·         Rapti (Chape Khola) Bridge (45.60 m)

·         Jhimruk Khola Bridge(41.60 m)

·         Bhiigri Khola Bridge(20.8 m)

·         Chiuragad Khola Bridge(22.8m)

·         Sulichaur Gajuri Bridge(60 m)

·         Uwa Khola Bridge(45.6 m)

 

 

 

Dang

Dang

Pyuthan

Pyuthan

Pyuthan

Rolpa

Rolpa

Rolpa

5,505,360.00 / Jul 2010 DOR/ Bridge Unit F, D
15. Feasibility Study, Detail Engineering Survey, Soil Investigation, Hydrological Study and Detail Design of Andhikohla Bridge, Bayartari Syangja 510,195/July 2012 DoR/Bridge Projects FD
16. Detail Engineering Survey, Soil Investigation, Hydrological analysis and detailed design work of following Rural Road Bridge

—   Pakhar Khola Bridge

Sindhupalchowk 546,976.50/July 2012 Trail Bridge Section/ DoLIDAR D
17. Feasibility Study, Detail Engineering Survey, Soil Investigation, Hydrological Study and Detail Design of following Bridges in Dhading

—   Mahesh Khola Bridge (41.20m) Naubise

—   Ankhu Khola Bridge (60.8m) Khahare Bazar

—   Mahesh Khola Bridge (25.80m) Dharke

—   Tuni Khola Bridge (37.6m)  Malekhu

—   Manpang Khola Bridge (37.6m) Siurenibensi

—   Ankhu Khola Bridge (60.80m)  Bangeraha

—   Trisuli Khola Bridge (129.05) Forsetar

—   Molung Khola Bridge (37.6m) Koshbhanjyang

 

Dhading 2,544,000/June 2012 DoR/Bridge Unit F,D
18. Feasibility Study, Detail Engineering Survey, Soil Investigation, Hydrological Study and Detail Design of following Bridges in Syangja

—   Dhau Khola Bridge (15.60m )  Waling

—   Maidi Khola Bridge (41.60m) Syangja

—   Andhi Khola Bridge ( 62.40m) Galyang

—   Kaligandi River Bridge (181.6m) Rampur

—   Kaligandi River Bridge (163.6m) Hungighat

—   Kaligandi River Bridge (152.4m) Syangja

 

Syangya 2,040,000/June 2012 DoR/Bridge Unit F,D
19. Site Selection, detail Engineering survey, Geo-technical/Hydrological Investigation and detailed design of appropriate River Crossings of :

—   Kamdehi Bridge

—   Lohiniya Bridge

—   Thuli Bheri Bridge

Rautahat

Rautahat

Rukum

692415/May 2014 Local Roads Bridge Program (LRBP) F,D
20. Feasibility Study, Detailed Engineering Survey, Hydrological Study, Social Investigation and Detailed Design of Bridges:

1.       Yanta Khola Bridge (25 m)

2.       Sera Khola Bridge (25 m)

3.       Daunte River Bridge (15 m)

4.       Kali Khola Bridge (40 m)

5.       Pahare Khola Bridge (30 m)

6.       Baidhanath Khola Bridge (40 m)

7.       Gideri Khola Bridge (60 m)

8.       Basawa Khola Bridge (25 m)

9.       Baijanath Khola Bridge (80 m)

10.   Bangari Bridge (70m)

11.   Sirsiya River Bridge (70 m)

 

 

 

1.       Bhojpur

2.       Okhaldhunga

3.       Khotang

4.       Khotang

5.       Khotang

6.       Udayapur

7.       Udaypur

8.       Udayapur

9.       Bara

10.   Bara

11.   Bara

90,02,710.00

July7, 2013 to July 15, 2016

 

Department of Roads

Bridge Branch

F,D